![]() You can apply these same map concepts to other schedules that lack the Outline Level, but you’ll need to build the Outline Level manually. Applying imports to other project schedules Once the schedules are converted, I insert them as subprojects in the master project schedule.īefore I came up with this solution, I would import the schedule as a new project I ran into calculation issues because the % Complete field is a calculated field and didn’t consistently convert. The end result is a properly formatted Microsoft Project file that contains the vendor’s project schedule.